By Antoine Thompson · President and Commercial Inspector
Framing and structure
- Studs, headers, and beams installed and fastened
- Hold-downs and connectors present where specified
- No damaged or improperly notched members
Rough-ins
- Plumbing supply and drain lines secured and protected
- Electrical boxes, wiring, and nail plates in place
- HVAC ducts connected, sealed, and supported
Envelope
- Windows and doors flashed
- Roof-to-wall flashing installed
- Weather barrier continuous and lapped correctly
Before you sign off
- Share the findings with your builder in writing
- Confirm corrections before insulation
- Keep the photos for your records
Scope note: Our inspections are visual, non-invasive assessments of readily accessible systems and components. They do not replace the advice of licensed engineers, attorneys, environmental consultants, or other specialists where needed.